To: | rfi@contesting.com |
---|---|
Subject: | Re: [RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI |
From: | KD7JYK DM09 <kd7jyk@earthlink.net> |
Date: | Wed, 16 May 2018 20:21:11 -0700 |
List-post: | <mailto:rfi@contesting.com> |
"it emphasizes the importance of twisted pair and shielding for all
wiring carrying noisy current"
Which reminds me, how does this work for AC mains feeding various noisy things, such as LED lighting? Would twisting romex be better, than sheathing it in ferrite, or, what about just putting it in conduit? How about twisting, AND conduit, for a 120VAC circuit? Kurt _______________________________________________ RFI mailing list RFI@contesting.com http://lists.contesting.com/mailman/listinfo/rfi |
Previous by Date: | Re: [RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI, Randy Standke |
---|---|
Next by Date: | Re: [RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI, Jim Brown |
Previous by Thread: | Re: [RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI, Jim Brown |
Next by Thread: | Re: [RFI] Solar Panel Manufacture Schedules Fix For Solar Panel RFI, Jim Brown |
Indexes: | [Date] [Thread] [Top] [All Lists] |