I believe the issue is conductor heating. Sheathed cable has to be in open-air 
to maintain its rating.  Conduit that encloses it impacts air flow.  
Someone advise if my understanding is incorrect.   I do not fully understand 
the electrical code. I am not licensed to expound on the electrical code. The 
only person I've ever encountered that would be even close, would be Mike 
Holt... 
Scott NM8R


Sent via the Samsung Galaxy S8+, an AT&T 4G LTE smartphone
-------- Original message --------From: Jim Brown <jim@audiosystemsgroup.com> 
Date: 5/17/18  12:55 PM  (GMT-05:00) To: rfi@contesting.com Subject: Re: [RFI] 
Solar Panel Manufacture Schedules Fix For Solar Panel RFI 
On 5/17/2018 9:20 AM, Alan NV8A wrote:
> Correct me if I am misremembering, but isn't running Romex in conduit 
> a Code violation? 

I don't know. I've never thought about doing that. It would be much 
harder to pull than individual conductors and it would be a waste of 
conduit fill capacity.

> Running twisted separate conductors in conduit would not be.

Right. And if it's steel conduit, twisting is not important.

73, Jim K9YC

_______________________________________________
RFI mailing list
RFI@contesting.com
http://lists.contesting.com/mailman/listinfo/rfi
_______________________________________________
RFI mailing list
RFI@contesting.com
http://lists.contesting.com/mailman/listinfo/rfi
<Prev in Thread] Current Thread [Next in Thread>