On 7/25/2015 4:22 PM, Roger (K8RI) on TT wrote:
Don't rush!  I'd wait the full 28 days.

, no stress on the concrete for 6 weeks after the pour.

Even lowering the tower straight down, that is still a fair load/stress for concrete not fully cured, or at least almost cured. The last few % takes a long time.

They stressed that with concrete, let it cure properly and don't rush!

73, Roger  (K8RI)
The % of cure asymptotically approaches its final value (gets closer and closer at a slowing rate of approach) so that theoretically it never quite finishes curing but gets close enough for most practical purposes (90% of the final strength) in 28 days if the temps aren't extreme (hot or cold.) Keeping the pour wet, especially the first several days is a good tactic.

Patrick

_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>