To: | <towertalk@contesting.com> |
---|---|
Subject: | [TowerTalk] Grounding connection to tower legs |
From: | "Jeff Blaine" <jeff@ac0c.com> |
Date: | Thu, 12 Oct 2017 19:41:54 -0500 |
List-post: | <mailto:towertalk@contesting.com> |
What’s the best way to connect the copper wire/strap to the 55G tower leg? I’m planning to clean the galvanized leg, wrap the leg with a layer of 0.005” SS shim stock and then use a couple of SS hose clamps to hold the wire against the tower leg. Is that the right way to do the attachment? Should I use any copper paste as well? 73/jeff/ac0c www.ac0c.com alpha-charlie-zero-charlie _______________________________________________ _______________________________________________ TowerTalk mailing list TowerTalk@contesting.com http://lists.contesting.com/mailman/listinfo/towertalk |
<Prev in Thread] | Current Thread | [Next in Thread> |
---|---|---|
|
Previous by Date: | [TowerTalk] 3-way handheld comm recommendation for tower work, Jeff |
---|---|
Next by Date: | Re: [TowerTalk] N0OST post Winch for UST layover and raise, Jeff Draughn |
Previous by Thread: | Re: [TowerTalk] Grounding connection to tower legs, AA6DX - Mark |
Next by Thread: | [TowerTalk] Fwd: Grounding connection to tower legs, Hans Hammarquist via TowerTalk |
Indexes: | [Date] [Thread] [Top] [All Lists] |