> -----Original Message-----
> From: amps-bounces@contesting.com [mailto:amps-bounces@contesting.com]
> On Behalf Of Jim Brown
> Sent: Tuesday, April 05, 2011 1:05 PM
> To: amps@contesting.com
> Subject: Re: [Amps] 4 wire 240VAC service? What to do now?
>
> On 4/5/2011 8:57 AM, Gary Schafer wrote:
> > Under today's NEC rules you always need a ground rod at the remote
> panel if
> > the remote panel is not in the same building as the main panel. And
> they
> > want a separate ground and separate neutral wire run from the main
> panel.
> > Ground and neutral remain separate in the remote panel.
>
> Remember that this is what I described as Method #2. Method #1 allows
> bonding neutral in the second building with no ground between buildings.
>
> 73, Jim K9YC
But method #1 hasn't been allowed in over 10 years.
73
Gary K4FMX