|  I have a question concerning feedline runs which I'd like to present to the 
group.
 
 I have four beverages with the feeds on one side (front) of my property and my 
tower and other
transmitting antennas on the other (back) side of my property with the house in 
the middle. The coax
runs and control lines from the transmitting antennas come into the house in 
the back where the utility
 lines come in and everything is tied together there to the utilities' ground, 
etc.
 
The problem is that if I bring the beverage feeds around to the back where the 
transmitting coax, etc. 
come in and bring them in there it will greatly increase the beverage feed runs 
(probably by 150-200ft)
with the resultant increase in loss, etc. I would prefer if I could bring in 
the beverage coax runs in via the 
front of the house (close to the shack) but then, of course, they are far from 
the utility/SPG ground. I do
 have a run of grounded #2 tied to the utility ground running around most of 
the house including the front.
 
Is there any good way of bringing the beverages in through the front or should 
I just accept the longer runs
and bring them through the back with everything else?
 
Thank you in advance for any comments!
 
                                                                  Mike  W2LO
 
 
 
 
 
                                          
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
 |